Design

Watch a Chinese Hotel Get Built in Just Six Days

  • November 12, 20104:00 am PST
  • + responses

00:00/00:0000:00

This Chinese hotel, made from all prefabricated materials, was built in six days. It is level 9 earthquake-resistant, sound-proofed, thermal-insulated, and 15-stories tall. According to the builders, there were no injuries and virtually no waste, due to the prefab materials.

There are buildings in my neighborhood that have been under construction six years, let alone six days.

Via Gizmodo

Posted in
+ responses
Comments via GOOD
Join or sign in to comment…
Comments loading
via Twitter
No Tweets